Mechanical performance, water quality and aesthetic condition across fountains, water walls and decorative features — including the lake-feature scope on Al Barsha Pond Park and Al Quoz Pond Park.
Water features are mechanical, hydraulic and aesthetic systems combined. Pump health, filtration regime, and water-quality programmes are inseparable from the visible appearance of the feature, and from the structural integrity of the basin or pond. Proscape FM has delivered water-feature scope on Dubai Municipality public-park lake features and on master-community decorative installations.
Periodic condition reports against the agreed specification, with photographic record where the contract requires it.
Programme document covering inspection cycles, scheduled servicing, and resource allocation across the contract term.
Year-end report tracking specification compliance, replacement events, and recommended programme adjustments for the following year.
Defined response window for storm damage, equipment failure, or other defects during the contract term.
Tell us about the contract — site, programme, and any tender reference. We will route to the right project team within one working day.
Sand, cartridge, biological and combined filtration regimes — Proscape FM services each against the original installation specification, with documented filter-media replacement intervals.
Where a feature is in a public-realm context, water-quality programmes are documented against the relevant authority specification. Specific compliance scope is confirmed per project.
Pump, dosing, controller and electrical interface — serviced under the maintenance contract on documented intervals.
Tile-line, basin lining, joint integrity and aesthetic appearance — inspected and serviced inside the same contract scope as the mechanical equipment.
A 30-minute consultation covers scope, programme and procurement route — no obligation beyond that.